Workflow & integration
Assessments triggered from the design phase and carried through the project lifecycle, rather than retrofitted at launch.
- Triggered from intake or CI/CD
- Threshold screening decides who needs one
- Risks tracked to closure, not to filing
- Reassessment on material change
